NNPC Sets ₦? Gas Ambition: Pipeline Financing Key to 12bscfd Target by 2030

By Atlantic Reports
The Nigerian National Petroleum Company Limited (NNPC Ltd.) has identified innovative pipeline financing, strategic partnerships and stronger indigenous technical capacity as essential to achieving Nigeria’s gas production targets of 10 billion standard cubic feet daily (bscfd) by 2027 and 12bscfd by 2030.
The Group Chief Executive Officer of NNPC Ltd., Mr Bashir Ojulari, stated this on Tuesday in Abuja in a keynote address at the Nigeria International Pipeline Technology and Security Conference (NIPITECS) 2026.
Ojulari, represented by the Managing Director of NNPC Gas Infrastructure Company (NGIC), Mr Audu Ibrahim, said national gas production currently stood at about 7.5bscfd.
He said reaching the 2030 target would require reliable pipeline infrastructure, sustainable financing arrangements and greater participation of Nigerian technical professionals and companies.
“Africa’s energy future depends as much on the partnerships we build above ground as on the resources we hold beneath the ground,” he said.
OB3 pipeline prepares for first gas
Ojulari highlighted three major pipeline projects as examples of the infrastructure and collaboration required to expand gas transportation across Nigeria and the wider region.
On the 105-kilometre, 48-inch Obiafu-Obrikom-Oben (OB3) pipeline, he said the project was designed to transport up to two billion cubic feet of gas daily from Rivers State to Edo State.
He said a major technical challenge involving the River Niger crossing had delayed the project for years.
According to him, NNPC, through its subsidiary NGIC, completed the crossing on 26 April using Horizontal Directional Drilling (HDD), which involved drilling approximately two kilometres beneath the river.
He added that pre-commissioning was completed in August 2026, with the pipeline ready for first gas.
Ojulari said the project demonstrated the importance of combining technical expertise with contract restructuring, local capabilities, financing and cooperation among NNPC, its subsidiaries and contractors.
AKK pipeline reaches 95 per cent completion
The NNPC chief also disclosed that the 640-kilometre Ajaokuta-Kaduna-Kano (AKK) gas pipeline project had reached approximately 95 per cent completion.
The $2.8 billion project is designed to transport 2.2bscfd of gas, with delivery to Abuja targeted before the end of 2026.
He said the project demonstrated how innovative financing could support large-scale energy infrastructure, noting that it had secured $1.5 billion in financing based on projected dividends.
However, the targeted delivery timeline remains dependent on the completion and commissioning of the outstanding project components.
Regional pipelines seen as growth opportunity
Ojulari also highlighted the 681-kilometre West African Gas Pipeline (WAGP), which transports Nigerian gas to Benin Republic, Togo and Ghana.
He said regional infrastructure projects could strengthen energy integration, improve access to gas and support economic development across West Africa.
He also pointed to the proposed Atlantic African gas pipeline, which is expected to link Nigeria towards Morocco.
According to him, intergovernmental agreements establishing a legal framework for the coastal gas project were signed in Freetown, Sierra Leone, in July.
The proposed pipeline forms part of wider efforts to expand cross-border energy infrastructure, although its eventual delivery will depend on financing, technical planning and cooperation among participating countries.
NNPC reports improvement in oil production
On production performance, Ojulari said Nigeria’s oil output had risen to 1.71 million barrels per day, which he described as the highest level in five years.
He attributed the improvement to increased pipeline availability, which he said had approached 100 per cent for the first time in two decades.
He also credited coordinated security operations involving the Office of the National Security Adviser, the NNPC Command Centre and community surveillance structures.
However, he stressed that maintaining the improvement would require sustained engagement with host communities and effective implementation of Host Community Development Trusts under the Petroleum Industry Act.
He said communities should be treated as active partners in protecting energy infrastructure rather than passive neighbours.
Financing and security remain critical
Ojulari urged industry stakeholders to deepen collaboration and develop practical financing models capable of attracting investment into Nigeria’s pipeline network.
His remarks highlight the connection between gas production targets and the infrastructure needed to transport gas from production fields to domestic and regional markets.
For Nigeria to achieve the proposed increase from 7.5bscfd to 12bscfd, the completion of major pipelines will need to translate into reliable gas delivery, while financing, security and maintenance arrangements must remain sustainable.
The progress of the OB3 and AKK projects will therefore be important indicators of whether the country's infrastructure ambitions can support its wider gas expansion plans.
Atlantic Reports: Voices. People. Facts.
Written by
Atlantic Reports Admin
Comments
- Be the first to comment.